Artisan Gallery 218 Construction Update Aug 4th

Hello Everyone!  We thought you might be interested in what is going on in the gallery.  Here is a brief update:

The entire ceiling has been removed and the interior of the gallery is being prepped for construction = nails being pulled, etc.  The joists in the space are all being raised in the center where there was a small bow and repaired from previous remodels.

The ceiling will be about 2 ft. higher than before so they are prepping to sheet rock the top of all existing walls to the ceiling.  The original tin ceiling will be reinstalled for the majority of the gallery.  Everything in the gallery will be painted white.  There will be a combination of LED Linear lights and track lighting throughout the space.

Overall the space will be spectacular!  We are sparing little cost to make it safe, beautiful and highly functional in a variety of purposes.

We are working toward an October 1st re-occupancy date.  Grand Re-opening date will follow once we are moved back in and the new exhibit is ready!